Our project references
You can filter and select our project references by fields of services.
You can filter and select our project references by fields of services.
Project | Service | Operator/Client | Period |
---|---|---|---|
OSS - Offshore Grid Connection Ostwind 2 | Production supervision of topsides for the Baltic Sea wind farms Arcadis Ost 1 and Baltic Eagle | Operator: 50Hertz Offshore GmbH | 2021 |
Offshore wind farms Amrumbank, Arkonabecken, Nordsee Ost | Annual maintenance of the diesel generators | Operator: RWE Renewables GmbH | 2021 |
HVDC - Converter station HelWin Beta | Planning and installation of a cable support system for 2x 155kV high-voltage cables for connecting the Kaskasi wind farm | Operator: TenneT TSO GmbH | 2021 |
HVDC - Converter station BorWin Alpha | Tank cleaning and tank checking | Operator: TenneT TSO GmbH | 2021 |
HVDC - Converter station BorWin Beta | Tank cleaning and tank checking | Operator: TenneT TSO GmbH | 2021 |
TP - Offshore wind farm HeDreiht | Steel construction for primary and secondary steel components, Electrotechnical equipment planning | Operator: EnBW He Dreiht GmbH | 2021 |
HVDC - Converter station DolWin Gamma | Planning, delivery and installation of a DN500 ball valve for the return line of the seawater cooling | Operator: TenneT TSO GmbH | 2021 |
OSS - Offshore wind farm Hohe See | Planning and execution of a generator replacement | Operator: EnBW Hohe See GmbH & Co. KG | 2021 |
OSS - Offshore wind farm Meerwind Süd/Ost | Repositioning the visual-range meter | Operator: WindMW GmbH | 2020 - 2021 |
HVDC - Converter stationes (different) | Preparation and revision of fire protection concepts, escape and rescue plans | Operator: TenneT TSO GmbH | 2020 - 2021 |
OSS - Offshore wind farm Hohe See | Planning and retrofit of the heliful system, fuel treatment unit, overfill protection | Operator: EnBW Hohe See GmbH & Co. KG | 2020 |
OSS - Offshore wind farm Hohe See | Planning and retrofit of the waste water tank | Operator: EnBW Hohe See GmbH & Co. KG | 2020 |
OSS - Offshore wind farm Riffgat | Change of design at the substation for additional 33kV cable | Operator: EWE Offshore Service & Solutions GmbH | 2020 |
HVDC - Converter station DolWin Gamma | Retrofit of the potable water system and sanitary water system | Operator: TenneT TSO GmbH | 2020 |
HVDC - Converter station DolWin Beta | Subsea inspection of HVDC cable protection system | Operator: TenneT TSO GmbH | 2020 |
HVDC - Converter station DolWin Gamma | Reconditioning of sludge tank | Operator: TenneT TSO GmbH | 2020 |
OSS - Offshore wind farm Baltic 1 | Corrosion protection work on 150 kV compensation reactor | Operator: EnBW AG | 2020 |
TP - Offshore wind farm Merkur Offshore | Annual electrical inspection of 66 TP foundations | Operator: Merkur Offshore GmbH | 2020 |
HVDC - Converter station BorWin Beta | Engineering and manufacturing of installation supports and installation of 15 Modular Living Quarters | Operator: TenneT TSO GmbH | 2020 |
HVDC - Converter station DolWin Gamma | Baseline inspection of jackets | Operator: TenneT TSO GmbH | 2020 |
Floodgate Oslebshausen | Survey of retrofit for flood protection | Operator: bremenports GmbH & Co. KG | 2020 |
TP - Offshore wind farm Yunlin | Workshop engineering for steel structure and electrical equipment | Operator: Yunneng Wind Power Co., Ltd. | 2020 |
OSS - Offshore wind farm Hohe See | Survey of fuel systems according to water law (AwSV und WHG) | Operator: EnBW Hohe See GmbH & Co. KG | 2020 |
OSS - Offshore wind farm Albatros | Hygiene control and initial hygiene inspection of HVAC systems | Operator: EnBW Albatros GmbH | 2020 |
TP - Offshore wind farm Yunlin | Supply of 80 PV facilities for the temporary power supply of a transition piece | Operator: Yunneng Wind Power Co., Ltd. | 2020 |
TP - Offshore wind farm Kaskasi | Design of primary and secondary steel components, Design electrical equipment | Operator: Innogy SE | 2019 - 2020 |
TP - Offshore wind farm Guanyin | Design of primary and secondary steel components, Design electrical equipment | Operator: Liwei Wind Power Co., Ltd. | 2019 - 2020 |
Sub-distribution car charging station | Preparation of a wiring manual | Operator: J.J.Darboven GmbH & Co. KG | 2019 |
TP - Offshore wind farm Northwester 2 | Flange survey, final survey | Operator: Parkwind NV | 2019 |
OSS - Offshore wind farm Hohe See | Room air-tightness tests for extinguishing gas systems (Blower Door Test) | Operator: EnBW Hohe See GmbH & Co. KG | 2019 |
HVDC - Converter stations SylWin Alpha, DolWin Beta, BorWin Beta | Design of a fixation for Fall Arrest System | Operator: TenneT TSO GmbH | 2019 |
HVDC - Converter station SylWin Alpha | Measurement of position and height of a helideck | Operator: TenneT TSO GmbH | 2019 |
OSS - Offshore wind farm Meerwind Süd/Ost | Measurement of position and height of a helideck | Operator: WindMW Service GmbH | 2019 |
TP - Offshore wind farm Yunlin | Design and construction of a PV test facility for the temporary power supply of a transition piece | Operator: Yunneng Wind Power Co., Ltd. | 2019 |
Onshore Substations Lütetsburg, Schwittersum, Hooksiel | Repair of the corrosion protection system on transformers | Operator: GE Grid | 2019 |
OWEC - General | Alignment and retrofit of a mounting device for a rotor hub of an OWEC | Operator: Siemens Gamesa Renewable Energy GmbH & Co. KG | 2019 |
OSS - Offshore Grid Connection Ostwind 2 | Design review of topside for the Baltic Sea wind farms Arcadis Ost 1 und Baltic Eagle | Operator: 50Hertz Offshore GmbH | 2019 |
HVDC - Converter station Bentwisch | HSE - Support at the converter site of the interconnector Kriegers Flak - Combined Grid Solution in Bentwisch | Operator: 50Hertz Transmission GmbH | 2019 |
OSS - Offshore wind farm Albatros | Offshore campaign coordination, offshore commissioning | Operator: EnBW Albatros GmbH | 2019 |
OSS - Offshore wind farm Hohe See | Plant manager with switching authority in the control room Hamburg / Offshore | Operator: EnBW Hohe See GmbH & Co. KG | 2019 |
OSS - Offshore wind farm Wikinger | Installation of an industrial floor in the GIS and control rooms of the OSS | Operator: Iberdrola S.A | 2019 |
HVDC - Converter station HelWin Alpha | Measurement of position and height of a helideck | Operator: TenneT TSO GmbH | 2019 |
OSS - Offshore wind farm Hohe See | Offshore campaign coordination | Operator: EnBW Hohe See GmbH & Co. KG | 2019 |
MP, TP - Offshore wind farm Yunlin | Design of primary and secondary steel components, Design electrical equipment | Operator: wpd offshore GmbH | 2018 - 2019 |
HVDC - Converter station DolWin Gamma | Room air-tightness tests for extinguishing gas systems (Blower Door Test) | Operator: TenneT TSO GmbH | 2018 - 2019 |
OSS - Offshore wind farm Albatros | Construction site management support for high, medium and low voltage systems at the yard site | Operator: EnBW Albatros GmbH | 2018 - 2019 |
OSS - Offshore wind farm Alpha Ventus | Measurement of position and height of a helideck | Operator: DOTI GmbH & Co. KG | 2018 |
TP - Offshore wind farm Kaskasi | Preparation of proposal drawings for secondary steel components | Operator: Innogy SE | 2018 |
WTG - Offshore wind farm Borkum Riffgrund 2 | HSE and documentation check for cranes and service lifts | Operator: Orsted | 2018 |
MP, TP - Offshore wind farm Saemangeum | Design of primary and secondary steel components | Operator: Saemangeum Sea Wind Power Co., Ltd. | 2018 |
OSS - Offshore wind farm Bard Offshore 1 | Development of an access concept for the OSS under-floor | Operator: Ocean Breeze Energy GmbH & Co. KG | 2018 |
Floodgate Oslebshausen | Structural analysis and steel design for flood protection | Operator: bremenports GmbH & Co. KG | 2018 |
HVDC - Converter station BorWin Beta | Planning for the retrofit of the Cable Access Tower (CAT) link connection | Operator: TenneT TSO GmbH | 2018 |
HVDC - Converter station DolWin Alpha & Gamma | Planning and implementation of various welding work (offshore) | Operator: TenneT TSO GmbH | 2018 |
OSS - Offshore wind farm Arkona Becken Süd/Ost | Offshore commissioning | Operator: E.ON Climate & Renewables GmbH | 2018 |
HVDC - Converter station HelWin Beta | Room air-tightness tests for extinguishing gas systems (Blower Door Test) | Operator: TenneT TSO GmbH | 2018 |
OSS - Offshore wind farm Baltic 2 | Preparation work for the Cable pull-in between Baltic 2 (Germany) and Kriegers Flak (Denmark) | Operator: NKT GmbH & Co. KG | 2018 |
TP - Offshore wind farm Horns Rev 3 | Measurement concrete platform, Flange survey | Operator: Vattenfall AB | 2018 |
TP - Offshore wind farm Arkona Becken Süd/Ost | Flange measurement Transition Piece after successful offshore installation | Operator: E.ON Climate & Renewables GmbH | 2018 |
OSS - Offshore wind farm Bard Offshore 1 | Planning of integration of two new emergency diesel power packs | Operator: Ocean Breeze Energy GmbH & Co. KG | 2018 |
MP, TP, Tower - General | Flange assembly fixture + segment lifting device, design and calculation incl. fabrication support | Operator: AMBAU GmbH | 2018 |
TP - Offshore wind farm Borkum West 2 / Phase 2 | Production supervision | Operator: Trianel Windkraftwerk Borkum GmbH & Co. KG | 2017 - 2018 |
TP - Offshore wind farm Nordsee One | Design of a ventilation and dehumidification concept | Operator: Nordsee One GmbH | 2017 - 2018 |
TP - Offshore wind farm Borkum West 2 / Phase 2 | Engineering and design electrical TP equipment | Operator: Trianel Windkraftwerk Borkum GmbH & Co. KG | 2017 - 2018 |
HVDC - Converter station DolWin Alpha | Reinforcement Bridge Landing: Planning and execution (structural steelwork, welding and coating) | Operator: TenneT TSO GmbH | 2017 |
400 to Offshore cable carousel | Planning / design of a 400 to turntable foundation for sea cables | Operator: Hulst Cable Equipment B.V. | 2017 |
OSS - Offshore wind farm Nordergründe | Maintenance 150 kV-GIS-System | Operator: OWP Nordergründe GmbH & Co. KG | 2017 |
OSS - Offshore wind farm Baltic 2 | Switch conversion 150 kV-GIS-System | Operator: EnBW AG | 2017 |
OSS - Offshore wind farm Nordergründe | Flange survey offshore crane | Operator: OWP Nordergründe GmbH & Co. KG | 2017 |
MP - Offshore wind farm Hollandse Kust Zuid 1&2 | Preparation of a concept design for foundations including secondary steel components | Operator: Siemens Wind Power GmbH & Co. KG | 2017 |
Floodgate Oslebshausen | Structural analysis and steel design for flood protection | Operator: bremenports GmbH & Co. KG | 2017 |
OSS - Offshore wind farm Bard Offshore 1 | Structural analysis and steel design of new lashing points on the helideck | Operator: Ocean Breeze Energy GmbH & Co. KG | 2017 |
TP - Offshore wind farm Borkum Riffgrund 2 | Measurement of primary and secondary steel components | Operator: Dong Energy | 2017 |
OSS - Offshore wind farm Alpha Ventus | Planning of the refurbishment of a tank | Operator: DOTI GmbH & Co. KG | 2017 |
OSS - Offshore wind farm Riffgat | Measurement of position and height of a helideck | Operator: EWE Offshore Service & Solutions GmbH | 2017 |
OSS - Offshore wind farm Deutsche Bucht | Certification support, definition and review of design requirements, design review of selected systems | Operator: Northland Power Inc. | 2017 |
Offshore cable carousel | Planning / design of a foundation for the support of baskets for sea cables | Operator: 50Hertz Transmission GmbH | 2017 |
Jacket - Offshore wind farm Wikinger | Flange survey offshore | Operator: Iberdrola S.A | 2017 |
TP - Offshore wind farm Borkum Riffgrund 2 | Flange survey, final survey | Operator: Dong Energy | 2017 |
MP - Offshore wind farm Merkur Offshore | Flange survey | Operator: Merkur Offshore GmbH | 2017 |
Tower, Nacelle - Adwen A8 Prototyp | Flange survey (tower, gearbox, blades) | Operator: Adwen GmbH | 2017 |
MP, TP - Offshore wind farm Borkum West 2 / Phase 2 | Design of primary and secondary steel components, Detailed design of electrical and mechanical components for 2. and 3. BSH-release | Operator: Trianel Windkraftwerk Borkum GmbH & Co. KG | 2016 - 2017 |
OSS - Offshore wind farm Arkona Becken Süd/Ost | Inspection of planning documents for conformity of valid regulations & standards, production supervision of single components & OSS in the shipyard | Operator: E.ON Climate & Renewables GmbH | 2016 - 2017 |
TP - Offshore wind farm Race Bank | Flange survey | Operator: Dong Energy | 2016 - 2017 |
Tower - Offshore wind farm Wikinger | Flange survey | Operator: Iberdrola S.A | 2016 - 2017 |
OSS - Offshore wind farm Global Tech I | Planning and implementation of a CTV fueling system on the upper deck | Operator: Global Tech I Offshore Wind GmbH | 2016 - 2017 |
MP, TP, Jacket, OSS - Offshore wind farm Baltic 2 | Coordination, execution & supervision of inspections, preparation of inspection concepts & reports | Operator: EnBW AG | 2016 |
Jacket, MP - Offshore wind farm Baltic-Eagle | Preparation of overview drawings, assembly drawings for Primary and Secondary Steel components | Operator: Siemens Wind Power GmbH & Co. KG | 2016 |
MP, OSS - Offshore wind farm Gennaker | Preparation of overview drawings, assembly drawings for Primary and Secondary Steel components | Operator: wpd offshore GmbH | 2016 |
MP, OSS - Offshore wind farm Kaskasi 2 | Preparation of overview drawings, assembly drawings for Primary and Secondary Steel components | Operator: Innogy SE | 2016 |
MP - Offshore wind farm Nördlicher Grund | Preparation of detailed design for primary and secondary steel components | Operator: Nördlicher Grund GmbH | 2016 |
OSS - Offshore wind farm Borkum West 2 | Inspection and retrofit of seawater cooling system, retrofit potential equalisation / ICCP-system | Operator: Trianel Windkraftwerk Borkum GmbH & Co. KG | 2016 |
Nacelle - Offshore wind farm Bard Offshore 1 | Bearing and flange survey | Operator: Ocean Breeze Energy GmbH & Co. KG | 2016 |
Tripile - Offshore wind farm Bard Offshore 1 | ROV underwater inspection inside the tripile tubes, water quality measurement | Operator: Ocean Breeze Energy GmbH & Co. KG | 2016 |
OAP - Offshore wind farm DanTysk | Coordination of subcontractors and suppliers for complete interior architecture and HVAC-system on the Offshore Accomodation Platform (OAP) | Operator: Vattenfall GmbH | 2016 |
OSS - Offshore wind farm Baltic 2 | Preparation and execution of acceptance tests (completion tests) of secondary systems. Elimination of warranty claims | Operator: EnBW AG | 2015 - 2017 |
OSS - Offshore wind farm Meerwind Süd/Ost | Preparation and execution of acceptance tests (completion tests) of secondary systems. Elimination of warranty claims | Operator: WindMW GmbH | 2015 - 2017 |